Status: V1.0 published and registered (DOI) for ten projects; V2.0 reviews completed for two

Author(s): Noel A. Johnson and Dillon Lorda, Conrad / Old i, LLC
Presented by: WoodWorks (V1.0, by license); ThinkWood (V2.0)
DOI (V1.0): 10.5281/zenodo.24567622

Market-rate, market-bound mass timber developments, studied with a business school business-case mindset: what was built and where, the proforma, market performance and lessons learned. The initial research was completed in 2021 and 2022; V2.0 updates that benefit from what the passage of time has revealed are underway.

Each property summary is a short distillation by the authors. The full V1.0 case studies, with costs, rents and returns, are registered as the authors' edition of record and are also published by license via WoodWorks.

Read the full V1.0 series, authors' edition of record (PDF, 88 pages) →
V1.0 case studies as presented by WoodWorks →

Cite as: Johnson & Lorda. (2022). Mass Timber Business Case Series. Conrad Investment Management / Old i, LLC. https://doi.org/10.5281/zenodo.24567622. Author ORCID (Johnson): 0009-0001-1422-7113.
The series may be read, shared unchanged and cited with credit to the authors; other uses require the authors' written permission. Photographs remain the property of the photographers credited.

A V2.0 review takes the V1.0 study as a fixed baseline and asks what the passage of time, market disruptions, releasing and evolving capital markets has revealed.

For-rent housing

Ascent, Milwaukee, WI
Photo: C.D. Smith Construction

Ascent

Apartments, high-rise · Milwaukee, WI · Delivered 2022

25 storeys and 259 apartments, with 19 storeys of mass timber over a six-storey parking podium. Total Project Costs of $130M ($502k/door) with a proforma untrended yield of 5.8% (in line with mkt norms of 6%). Capitalization: 70% LTC + 15% Mezz. The tallest timber structure in the world when built.

Successes

  • Strong lease-up: 45% pre-leased at completion, at top-of-market rents.
  • Speed: About four months saved on the schedule (pandemic and shipping delays aside).
  • Marketing: Use of mass timber generated helpful PR / market awareness.
  • Public: Policy alignment generated gov't support across multiple channels.

Challenges

  • Insurance: Cost about three times the standard rate, and lenders needed convincing.
  • Building code: Substantial additional costs, time & expertise required to gain approvals.

No V2.0 review yet.

↑ All ten projects

INTRO, Cleveland, OH
Photo: Nick Johnson, Tour D Space

INTRO

Apartments, mixed-use · Cleveland, OH · Delivered 2022

Nine storeys with 297 apartments, ground-floor retail and a public event space; eight storeys of mass timber over a concrete podium. Total Project Costs of $147M ($495k/door) with a proforma untrended yield of 7.0% (above mkt norms of 6.25%; realized 7.35%). Capitalization: 65% LTC, with the developer providing the equity.

Successes

  • Strong lease-up: 60% pre-leased and 90% leased four months after completion, at record velocity.
  • Premium rents: The highest apartment rents in Cleveland, about 28% above market for a one-bedroom.
  • Debt: Refinancing efforts began less than three months after opening.
  • Public: Aligned with the city's ESG policy objectives; a tall-wood precedent for other jurisdictions and developers.

Challenges

  • Speed: Expected schedule savings not fully achieved; trades were new to the system and the cladding could not keep pace with the timber structure.
  • Moisture: Laborious repairs required where water was not managed well during construction.
  • Building code: A variance was needed to use the 2021 tall-wood code before local adoption.
  • Cost: Higher bids from inexperienced builders, and higher design fees for early coordination of building services.

No V2.0 review yet.

↑ All ten projects

The Canyons, Portland, OR
Photo: Jeremy Bittermann

The Canyons

Apartments with retail · Portland, OR · Delivered 2020

Six storeys with 70 larger-than-usual apartments, first aimed at active adults aged 55 and over; five levels of cross-laminated timber over ground-floor retail. Total Project Costs of $32M ($457k/door) with a proforma untrended yield of 5.7% (in line with mkt norms of 5.5%). Capitalization: 60% LTC.

Successes

  • Premium rents: A clear rent premium in a design-oriented submarket; a one-bedroom about 46% above market.
  • Stable tenancy: The owner chose best rents over fast lease-up; slower absorption, but tenants who stay.
  • Design: Open-air corridors showcase the timber and bring fresh air to every front door, which appealed to tenants, banks and appraisers.
  • Spillover: Remaining condos in the neighbouring Carbon12 building sold once construction completed.
  • Cost and speed: Built at market cost and about 10% faster (pandemic effects aside).

Challenges

  • Insurance: Rates were high, and hard to separate from a rising insurance market.
  • Retail: Required by the city but hit hardest by the pandemic; banks valued it at zero.
  • Building code: Fire-code trade-offs made the one-storey live/work units costlier to build and harder to lease.
  • Timing: The target clientele was largely confined to home through the pandemic.

The building sold in August 2025 for $23.5 million to a new owner, with a new lender and a new property manager. An arm's-length sale turns opinion into observation, and the buyer's offering memorandum shows what a sophisticated sponsor believes moves investors' money.

What lasted was resilience: occupancy, differentiation and breadth of buyer interest. What faded was the rent premium and any awareness of the timber among those running and renting the building.

Appears lasting

More stable tenantsV1.0 supportedOccupancy held above 85% through a soft market while nearby properties struggled to hold 80%. Mass timber may help cash flows survive downturns comparatively better.
DifferentiationNew in V2.0The building's distinct look and feel survived changes of owner, manager and target market. The buyer's memorandum leads with the timber atrium and the "condo quality" homes.
Wider pool of buyersNew in V2.0Mass timber drew more interested buyers than a conventional 70-unit building would have, in a risk-off market for apartments. It was not seen to raise the price paid.
Insurance and lender cautionV1.0 concern easedNo adverse pricing from lenders, insurers or the broker was detected at the sale.

Appears temporary, or due to market timing

Premium rentsV1.0 not supportedThe rent premium was not sustained. Attribution is murky; the 55-and-over focus was dropped, the Portland rental market weakened and the property manager changed. In hindsight the 2022 premium may have been earned by the product and its service more than by the timber.
Awareness and values signallingNew in V2.0Awareness of the mass timber decays with distance from the development decision. Residents find the homes unique without knowing why, the on-site manager did not market it, and no carbon or values signalling to tenants was detected.

Unclear, or not observed

Price paidNew in V2.0Indeterminate. The buyer's residential basis of about $310 per net square foot sits within the range of conventional comparables nearby, but recent Portland sales are few, distressed, and include no other mass timber building to compare with.
A natural experiment: inside the offering memorandum

To raise capital for the purchase, the buyer's sponsor had to decide how much of a finite, persuasive document to give to each attribute of the building. That is a revealed preference. Seven standard appraisal attributes were coded across the memorandum's first 20 pages through three channels: share of page space (weighted 45%), keyword mentions (20%) and photographs (35%).

Unit design and layout23.2
Location and site22.6
Common area amenities17.6
Mass timber / wood14.2
Building program and scale9.3
Cost / value basis8.5
Construction quality (general)4.7
AttributePage spaceMentionsImagesCombined
Unit design and layout24.232.622.123.2
Location and site23.219.029.422.6
Common area amenities18.110.925.017.6
Mass timber / wood11.99.223.514.2
Building program and scale10.98.2n/a9.3
Cost / value basis7.213.6n/a8.5
Construction quality (general)4.46.5n/a4.7

Mass timber ranks fourth of seven, about level with gyms and roof decks. It is shown far more than it is written about: its image score is among the highest while its page and mention scores are thin. Wood is seen but not yet counted in the asset arithmetic; a branding device not yet translated into a priced or risk-adjusted underwriting variable.

Underwriting notes
MechanismDirectionScale and nature
Breadth of buyer interestPositiveSmall; may act on the cap rate or on a buyer's growth assumptions
Price paid / cap rateIndeterminateToo few comparable transactions
Rent premiumNot sustainedSmall; may help lease-up and value at stabilization or refinance
Occupancy resiliencePositiveLowers NOI volatility; improves leverage and cap rate potential
Stigma from lenders and insurersNone detectedNo change to the proforma
Tenant values signalling (carbon / ESG)None detected; fadesHelps lease-up and return to stabilization

Method: A before-and-after comparison against the April 2022 case study, drawing on interviews with the developer, the selling broker, the new owner's asset managers and the property manager, resident surveys, the buyer's information memorandum, public records and published market data.

↑ All ten projects

For-sale housing

Barracuda Condos, Madison, WI
Photo: Populance

Barracuda Condos

Condominiums · Madison, WI · Delivered 2020

Seven storeys with 19 two-bedroom condominiums over offices and parking; a hybrid of steel framing with glue-laminated timber floors and roof. Total Project Costs of $10.8M proforma ($452k/unit) and $11.7M realized ($524k/unit), with a proforma return on cost of 6.0% (realized 4.9%) and return on equity of 21.5% (realized 17.1%). Capitalization: 60% LTC from a local bank (66.5% realized).

Successes

  • Pre-sales: 75% sold at the start of construction, which enabled financing; 95% sold before completion.
  • No walk-aways: Buyers who wavered during the pandemic all closed after seeing the nearly finished homes.
  • Pricing: Realized sales prices about 48% above market.
  • Local supply: Locally fabricated timber panels avoided fabricator queues, shipping cost and pandemic delays.
  • Investors: The product is attracting new investors to the developer's next deals.

Challenges

  • Cost: Construction ran well above proforma ($202 vs. $153/GSF), reducing returns.
  • Moisture: Managing moisture during construction.
  • Lenders: Disliked the lack of parking; a smaller local bank that understood the location provided the loan.
  • Building code: An all-timber design gave way to a steel and timber hybrid to ease approvals.

No V2.0 review yet.

↑ All ten projects

Redevelopment and additions

Timber Lofts, Milwaukee, WI
Photo: ADX Creative and Engberg Anderson Architects

Timber Lofts

Apartments, reuse and addition · Milwaukee, WI · Delivered 2020

60 apartments; 33 in a five-storey 1890s warehouse and 27 in a new cross-laminated timber addition beside it. Total Project Costs of $14.6M ($243k/door), supported by $2M of historic tax credits, with a proforma untrended yield of 5.5% after subsidy (in line with mkt norms of 5.5%). Capitalization: 70% LTC.

Successes

  • Strong lease-up: Met aggressive leasing assumptions and leased faster than comparable buildings, at top-of-market rents.
  • Differentiation: Mass timber let the addition harmonize with the historic brick and timber building.
  • Cost: The timber addition cost about 7% more than the market standard, countering the belief that mass timber is considerably more expensive.
  • Spillover: A noteworthy project that lifted momentum and perceptions of the street and submarket.

Challenges

  • Tax credits: The $2M of historic credits came with many design requirements from the National Park Service.
  • Insurance: Costs ran above proforma, though perhaps because of the general market.
  • Retail: Still not leased as of October 2021.
  • Tenants: Surveys suggest sustainability was not a priority for them.

No V2.0 review yet.

↑ All ten projects

Purpose-built, owner-occupied

Adohi Hall, Fayetteville, AR
Photo: Timothy Hursley

Adohi Hall

Student housing · Fayetteville, AR · Delivered 2019

A 708-bed living and learning community at the University of Arkansas, about 202,000 square feet. Total Project Costs of $64.1M ($90.5k/bed), of which $48.9M ($69k/bed) is residential, funded entirely from the university's auxiliary budget. Construction cost of $317/GSF against a market standard of $304/GSF. Owner-occupied, so no yield is reported.

Successes

  • On time and on budget: Recovered four months lost to a delayed construction start.
  • Financing: The use of cross-laminated timber raised no concerns for the lender or its underwriting.
  • Performance: A highly desirable housing option at top-of-market rents; hit proforma and is paying its debt.
  • Private sector influence: Reduced fire marshal and code-official resistance for later private projects in the state.

Challenges

  • Cost perceptions: Steel and mass timber designs were both carried to 30% design development to prove cost-to-value.
  • Supply chain: Timber sourced from Europe, with the contractor owning ship-to-site logistics.
  • Design cost: Full early coordination of building services for prefabrication raised design fees and added four months of documentation.
  • Communication: Many stakeholders with economic and non-economic goals required extra effort.

No V2.0 review yet.

↑ All ten projects

Office

1 De Haro, San Francisco, CA
Photo: David Wakely

1 De Haro

Office and light industrial · San Francisco, CA · Delivered 2021

Three storeys of cross-laminated timber over a concrete podium, about 134,000 square feet. The first building of its kind in San Francisco. Construction cost of $52.5M ($392/GSF, about 2% above the market standard) with a proforma untrended yield of 7.5% (in line with mkt norms of 7.6%; realized 7.6%). Capitalization: 60% LTC proforma (77% realized).

Successes

  • Strong lease-up: Leased at the start of construction, with multiple back-up offers above the accepted offer.
  • Foundations: A structure 20-50% lighter than concrete saved foundation cost on poor soils.
  • Speed: Prefabrication brought a shorter schedule and less noise in a dense urban setting.
  • Carbon: 51% less embodied carbon than a concrete structure.
  • Public: The City and the local Carpenters Union were engaged early and were supportive.

Challenges

  • Insurance: Premiums were higher, with few insurers willing to quote.
  • Timing: The pandemic and utility delays extended the schedule and added cost.
  • Moisture: Wet-season construction led to added cost to re-finish the wood.
  • Detailing: Standard rated details did not yet exist and had to be developed with the code officials.

No V2.0 review yet.

↑ All ten projects

Clay Creative, Portland, OR
Photo: Mackenzie; Christian Columbres Photography

Clay Creative

Office · Portland, OR · Delivered 2015

Five storeys and about 95,000 square feet, built speculatively. The first large, unsubsidized commercial mass timber office delivered in the United States. Total Project Costs of $27.25M ($356/GSF, about 9% above the market standard) with a proforma untrended yield of 7.5% (in line with mkt norms of 7.5%; realized 7.7%). Capitalization: 65% LTC (67% realized).

Successes

  • Strong lease-up: Better-than-market leasing velocity to creditworthy tenants at proforma rents.
  • Speed: Fast construction let tenant fit-out run alongside the base building, bringing occupancy sooner.
  • Occupancy: Later sub-leasing and re-leasing has been strong.
  • Returns: A realized equity multiple of 2.0x against a market norm of 1.75x.
  • Synergies: Underfloor services and ceiling finishes can partly offset the cost of the timber.

Challenges

  • Cost: The timber structure and raised-floor HVAC drove a construction premium of about 12%.
  • Insurance: More expensive than for traditional buildings.
  • Financing: Fewer willing lenders, as some are averse to the risk or the effort.
  • Building code: Permitting took longer and was more complicated for new details.
  • Construction: Subcontractors underestimated the implications; a detail-oriented general contractor was essential.

Ten years of operation, through the strongest office market in Portland's modern history (2016 to 2019), a demand shock, the wind-down of an anchor tenant, and the deepest office repricing in the market's modern history (2022 to the present).

What lasted was protection of cash flow: the building keeps winning creditworthy tenants when the market is at its worst. What proved temporary was the peak-market pricing of its first years, and the benefit of speed turned out to be mostly one of timing.

Appears lasting

Leasing strength and credit qualityV1.0 supportedA persistent advantage in turning tours into shortlists, pricing that avoided the deep concessions competitors accepted, and repeated capture of the market's scarce larger, creditworthy tenants. The value shows up as steadier cash flow more than as higher rent.
Broad tenant appeal in a downturnNew in V2.0The wood workspace has no close substitute among competing buildings, which holds a floor under lease terms when others capitulate. It acts like a put option for the owner, paying when it is most needed, and it is not yet priced.
Second-generation spaceNew in V2.0Unusually for offices, previously occupied space is seen as a better fit and finish than new space elsewhere, so the owner's earlier fit-out investment survives tenant turnover.
Lenders and insurersV1.0 concern easedThe building was refinanced from a regional bank to a conservative national life insurance lender with no discount or premium for timber, and insurance effects have been minimal. Capital markets price the numbers, so any timber benefit must arrive through the cash flows.

Appears temporary, or due to market timing

Top-of-market rents at stabilizationV1.0 mixedIt is not reasonable to separate the early outperformance from ideal timing in the office cycle. New leases are at the top of today's market, but below the rents of earlier years.
Faster deliveryV1.0 supportedSupported, with a different emphasis. Speed mattered most as a way to deliver into peak demand and to reduce risk, more than for the cost and interest savings usually cited.
Marketing salienceNew in V2.0The building was rebranded and the new positioning mentions mass timber rarely, leading with location and other fundamentals. The experiential effect on leasing persists without it.

Unclear, or not observed

Savings from underfloor systemsV1.0 not supportedOwners and leasing brokers see no faster or cheaper tenant fit-out from the raised floor and underfloor services that the first study expected to pair well with timber.
A conditionNew in V2.0Timber multiplies strong fundamentals such as location, parking, nearby amenities and streetscape. It does not substitute for them; comparable timber buildings without those fundamentals do not show the same effects.
“When prospects set foot in the building, it always makes their short list.”President of the firm that asset-manages the building
A natural experiment on Clay Street

Same market, same location, same quality, same owner, same leasing team, same four years. Different outcomes. With Portland office absorption persistently negative and vacancy near 22%, three adjacent buildings developed by the same group were offered to the same thin pool of tenants.

Clay CreativeMass timber office, 2015LeasedNew high-credit tenants at the top of current market rents.
120 ClayMass timber office, next doorLeasedNew high-credit tenants at the top of current market rents.
1510 Tech CenterHistoric concrete reuse, adjacentNo replacement tenantEqual leasing effort; some features superior, including very low energy use and private protected parking.

Between them the two mass timber buildings secured a grocery company's lease, a credit tenant of about 20,000 square feet and a further 16,000 square feet under letter of intent. The comparison suggests the outperformance is not only a general flight to quality; it shows up at the level of the individual property.

Underwriting illustrations
MechanismDirectionScale and nature
Lower-volatility cash flowsPositiveImproves cap rates (value) and leveraged returns
Broader tenant appealPositiveImproves occupancy and turnover; avoids expenses and new capital spending
Option valuePositiveHelpful for owners with flexibility on timing
Dovetailed building systemsNot observedAvoid extra cost to maximize return
Faster erectionPositiveMore for market timing than for a shorter total duration
MarketingPositiveSustained appeal without effort or annual expense

Method: A before-and-after comparison against the original case study, drawing on interviews with the building's ownership and its leasing broker in July 2026 and on published market data from JLL, Nareit, NCREIF and others.

↑ All ten projects

District Office, Portland, OR
Photo: Hacker

District Office

Office with retail · Portland, OR · Delivered 2020

Six storeys and about 106,000 square feet, with a third of the office space pre-leased to the architecture firm that designed it. Total Project Costs of $40.5M ($399/GSF, about 14% above the market standard) with a proforma untrended yield of 7.2% (in line with mkt norms of 7.25%). Capitalization: 65% LTC, with equity from internal funds.

Successes

  • Pre-leasing: 70% pre-leased before the pandemic, anchored by the building's architect.
  • Structural efficiency: Thinner timber panels, a repeatable connection and an industrial finish grade kept cost down.
  • Daylight: Timber spans removed the perimeter beam, so windows reach the ceiling.
  • Speed: Just-in-time delivery let components be lifted straight from the truck into place.
  • Flexibility: Removable floor panels let tenants create an atrium or internal stair.

Challenges

  • Timing: Delivered into the pandemic; leasing of the remainder slowed.
  • Competition: Several other office buildings reached the Central Eastside market at the same time.
  • Building services: Routing through an exposed structure took a purpose-made solution.
  • Returns: A proforma leveraged return of 14% against a market norm of 18%.

No V2.0 review yet.

↑ All ten projects

The ICE Blocks, Sacramento, CA
Photo: RMW Architecture & Interiors; Bernard André Photography

The ICE Blocks

Office and retail · Sacramento, CA · Delivered Summer 2018

A new mass timber building of about 132,000 rentable square feet, replacing a historic warehouse lost to fire within a larger reuse project. Total Project Costs of $48.5M ($367/GSF, about 3% above the market standard) with a proforma untrended yield of 7.7% (above mkt norms of 7.25%). Capitalization: 65% LTC.

Successes

  • Strong lease-up: Offices leased quickly while under construction, to quality tenants.
  • Cost: Only slightly more expensive to deliver a differentiated space.
  • Public: Limited pushback on entitlements; the city came to the table as a partner.
  • Capital partners: Stayed with the project through the uncertainty and delays caused by the fire.

Challenges

  • Rents: Did not achieve above-market rents.
  • Cost: Used the full contingency and a little more.
  • Detailing: With everything exposed, subcontractors had to work to an aesthetic standard; capable subs were limited.
  • Re-leasing: Demising walls are not easy to move.
  • Commissions: Broker commissions ran about 25% above the market standard.

No V2.0 review yet.

↑ All ten projects

The Mass Timber Business Case Series is authored and owned by Conrad (© 2022 Conrad Investment Management / Old i, LLC). It is licensed for presentation by WoodWorks and/or ThinkWood; wider use is welcomed, please contact the authors with interest.